Selesy Olia Irrigation Networks and Pumping Station Project

  • company: NASR INTERNATIONAL CO. KURDISTAN
  • Condition: doing
  • Employer: Kurdistan Regional Water Company
  • Consultant: Tavan Consulting Engineers Co
  • Development: 80percent
  • Location: Kurdistan
  • Grouping:

Selesy Olia Irrigation Networks and Pumping Station
Project
Contract subject: Construction, procurement, transportation,
installation, launching and experimental operation of Selsey
Olia Pumping Station- Storage and service tanks and grade
1 and 2 pipelines and irrigation network of Marivan Second
Construction Unit
Purpose of the project: To provide proper pressure for
irrigation under pressure in parts of the northern and western
lands of the Selesy plain with an area of 553 hectares
Employer: Kurdistan Regional Water Company
Supervisory Company: Tavan Consulting Engineers Co.
Total amount of the contract: 145,921,409,372 Rials
Pumping station: Capacity of 550 liters per second
Steel intubation with a diameter of 600,700,1000 mm, with a
length about 5 km
Polyethylene intubation ranging from 90 to 560 mm in
diameter, about 40 km
Construction of a suction tank with 1800 cubic meters
capacity
Construction of a buoyancy tank with a capacity of 1800
cubic meters
Construction of 98 airflow valve ponds
Construction of 131 ponds for water branches

Other projects of NASR INTERNATIONAL CO. KURDISTAN