Completion project of the Garan Dam Water Transfer
- company: NASR INTERNATIONAL CO. KURDISTAN
- Condition: doing
- Employer: Kurdistan Regional Water Company
- Consultant: Pouyab Consulting Engineers Co.
- Development: 60percent
- Location: Kurdistan
- Grouping:
Completion project of the Garan Dam Water Transfer
System and implementing the preparatory steps for
construction of the new city of Chenara
Purpose of the project: Providing drinking water to some
parts of Marivan city and supplying the water needed for the
farming of the plains around this city
Contract amount: 170 billion Rials
Employer: Kurdistan Regional Water Company
Supervisory office: Pouyab Consulting Engineers Co.
Excavating excavator with a volume of 400,000 cubic meters
Construction of a concrete channel in the area of 5.5 km
along with the relevant buildings
Intubation with steel pipes 1295/5 mm with a length of 3/2
km
Execution of 652 m Siphon with steel pipes 1676/4 mm and
660/4 mm
Other projects of NASR INTERNATIONAL CO. KURDISTAN
Constructing irrigation sub-network project in Khuzestan province
NASR INTERNATIONAL CO. KURDISTANKhuzestan
Selesy Olia Irrigation Networks and Pumping Station Project
NASR INTERNATIONAL CO. KURDISTANKurdistan
Construction of wastewater treatment plant in Saghez and Dehgolan and Ghelyan village
NASR INTERNATIONAL CO. KURDISTANKurdistan
Preparing Mehr Housing Project of Sanandaj and construction of 1120 residential units
NASR INTERNATIONAL CO. KURDISTANKurdistan
Constructing 310 Mehr residential units as apartments in Saghez
NASR INTERNATIONAL CO. KURDISTANKurdistan
Sanandaj-Marivan road construction project route(Tutar-Shoisha)
NASR INTERNATIONAL CO. KURDISTANKurdistan