Thursday November 21st 2024

Completion project of the Garan Dam Water Transfer

  • company: NASR INTERNATIONAL CO. KURDISTAN
  • Condition: doing
  • Employer: Kurdistan Regional Water Company
  • Consultant: Pouyab Consulting Engineers Co.
  • Development: 60percent
  • Location: Kurdistan
  • Grouping:

Completion project of the Garan Dam Water Transfer
System and implementing the preparatory steps for
construction of the new city of Chenara
Purpose of the project: Providing drinking water to some
parts of Marivan city and supplying the water needed for the
farming of the plains around this city
Contract amount: 170 billion Rials
Employer: Kurdistan Regional Water Company
Supervisory office: Pouyab Consulting Engineers Co.
Excavating excavator with a volume of 400,000 cubic meters
Construction of a concrete channel in the area of 5.5 km
along with the relevant buildings
Intubation with steel pipes 1295/5 mm with a length of 3/2
km
Execution of 652 m Siphon with steel pipes 1676/4 mm and
660/4 mm

Other projects of NASR INTERNATIONAL CO. KURDISTAN