Mohammadiyah non-level intersection
- company: international development group nasr sepehr
- Condition: doing
- Employer: Mohammadiyah Municipality
- Consultant: Consulting Engineers haraz rah
- Development: 0percent
- Location: Qazvin
- Grouping:
Construction of a two-level non-level intersection at the intersection of Karaj-Qazvin freeway with Shahid Motahari Boulevard as an overpass, including two parallel bridges, ramps and 4 access loops with a cumulative length of 1,200 meters.
• The deck structure of these bridges is a composite type with a steel arch that is 70 meters long and 26 meters wide and its longest span is 37 meters long on the Karaj-Qazvin freeway.
• The retaining wall of the ramps is made of geogrid reinforced soil, which is covered with prefabricated concrete parts.