Saturday December 21st 2024

Construction of modules 7 and 8 of the wastewater treatment plant in the south of Tehran

  • company: international development group nasr sepehr
  • Condition: doing
  • Employer: Tehran Sewerage Company
  • Consultant:
  • Development: 0percent
  • Location: Tehran
  • Grouping:

Design and engineering services, construction of structures, supply, transportation, installation, pre-commissioning and commissioning of equipment required for modules 7 and 8 of Tehran South Wastewater Treatment Plant with advanced activated sludge method for a population of about 1,200,000 people with a capacity of 230,000 cubic meters per day located in the south of Tehran

Other projects of international development group nasr sepehr